carl-junction.jpg

Carl Junction High School

HVAC Assessment and Replacement

Conducted lifecycle cost assessment to evaluate HVAC upgrade opportunities.

Performed design, engineering, construction administration, and commissioning for replacement of 56 rooftop units and installation of a new building control system.

neonbrand-426918-unsplash.jpg

Republic School District

Energy Study

Developed energy models to analyze the district’s energy usage and calculate potential energy savings of proposed building automation systems.

Modeled approximately 850,000 square feet of district facilities with limited as-built documentation.

jamie-taylor-110195-unsplash.jpg

Christian County Library

Infill and Renovation

Performed design and engineering of mechanical, electrical, and plumbing systems for infill and renovation projects at two separate library branches.

Required extensive field investigations and 3D laser scanning to locate and verify existing conditions.

francesco-gallarotti-134632-unsplash.jpg

Heart of America Beverage Company

Plumbing Design-Build

Performed design and engineering of plumbing systems for new industrial beverage packaging and distribution facility.

Partnered with local mechanical contractor to provide design-build project delivery.

True Engineering-0025.jpg

Republic High School

Activities Stadium

Performed design and engineering of all mechanical, electrical, and plumbing systems.

Consisted of home and visitor fieldhouses featuring locker rooms and concessions, home and visitor bleachers, athletic field, and press box.

True-Engineering-3251.jpg

Evangel University

Lewis Hall Piping Modifications

Performed design and engineering of new domestic hot water piping system with new recirculation pumps and connections to existing water heaters and storage tank serving existing residence hall.

Utilized 3D laser scanning technology to develop accurate as-built documents reflecting existing conditions as no current plans were available.

True-Engineering-3265 (2).jpg

Missouri Southern State University

Chilled Water Feasibility Study

Developed control sequence to interject existing chillers into existing chilled water loop.

Performed 3D laser scanning of existing mechanical rooms.

yes.jpg

Springfield public schools

secure entries

After passing Proposition S, Springfield Public Schools is adding secure entrances to existing schools to improve safety. The secure entrances are controlled paths of entry with integrated security cameras, intercoms, and electronic locks that allow school staff to supervise and control access to the building.

True Engineering Group leveraged 3D laser scanning technology to accurately document as built conditions.